Quick Sites: Sign in to Use

BADM Group: TOWER_POWER

BADM Type: Site General Info
Description: Tower Power
Group Entries per Site: Multiple
Last updated: Jan 19, 2021

BADM Group Overview

BADM variables in this group are organized as shown below. The overview highlights what variables are required per group. It also indicates which variables cannot be specified together ( OR ) in the same group entry. See BADM Basics for more details.

Multiple entries of this BADM group can be reported per site. However, combinations of variables must be unique. Read more:

Required Variable
Optional Variable
Combinations
Examples
RequiredOptional
Tower Power
  • TOWER_POWER
  • BADM variables: Definitions, Units, Requirements

    See Overview tab or BADM Basics for explanation of Required and Optional variables.

    Multiple entries of this BADM group can be reported per site. However, combinations of variables must be unique. Read more:

    Required Variable
    Optional Variable
    Combinations
    Examples
    Variable
    Requirements
    Units Description
    TOWER_POWER
    Required
    LIST(TOWER_POWER) ShowHow the eddy covariance system is powered
    TOWER_POWER Options×
    OptionDescription
    Direct powerA/C power connection
    Solar panelsSolar panels and batteries
    Wind generator
    Methanol generator
    Gasoline generator
    Solar + generator
    OtherOther type of power source

    BADM Examples

    Choose a variable marked with to show examples of how to submit and interpret these BADM. See BADM Basics for more details.

    Combinations of variables must be unique. Read more: .

    Required Variable
    Optional Variable
    Combinations
    Examples
    Tower Power
  • TOWER_POWER
  • Click a variable marked with to see examples.
    No example currently available

    Customize and Download CSV for BADM Submission

    After selecting your desired variables, download the customized CSV file for submission of BADM. For additional submission details, see BADM Submission Instructions. See BADM Basics for general BADM details.

    Multiple entries of this BADM group can be reported per site. However, combinations of variables must be unique. Read more: . See BADM Basics for more details.

    Required Variable
    Optional Variable
    Combinations
    Examples
    Open/Close
    Select
  • Required
  • Tower Power
    TOWER_POWER
  • Submit completed CSV file at Upload Data using the BADM option (login required).